Knowledge Centre
Templates 2 min read 30 June 2026

Cleaning Method Statements: Complete Contractor Guide

What a cleaning method statement is, when clients require one, and how to write one that clearly explains how a job will be carried out safely.

A method statement explains, step by step, how a cleaning job will be carried out safely. Alongside a risk assessment, it forms what's commonly called a RAMS document (Risk Assessment and Method Statement) — and it's frequently requested by clients in construction, education, healthcare and facilities management before work begins.

What a method statement is for

Where a risk assessment identifies hazards and controls, a method statement describes the actual sequence of work: what will be done, in what order, using what equipment and products, and by whom. It gives the client confidence that the job has been properly planned, not just risk-assessed in theory.

What to include

  • Description of the work and the site
  • Sequence of tasks, in order
  • Equipment and chemicals to be used, referencing your COSHH assessment where hazardous substances are involved
  • PPE required for the task
  • Number of staff and their roles
  • Any access, isolation or permit-to-work requirements
  • Emergency procedures specific to the task

When clients ask for one

Method statements are most commonly requested for specialist or higher-risk work — deep cleans, post-construction cleans, work at height (external windows, high-level dusting), or any job on a site with strict health and safety requirements, such as a hospital or school. Standard daily office cleaning is less likely to require one, but it's worth having a template ready regardless, since larger clients increasingly ask as standard practice.

Method statements and risk assessments work together

A method statement without a risk assessment behind it is just a task list — it doesn't demonstrate that hazards have actually been considered. Always pair method statements with a proper cleaning risk assessment covering the same job, so the two documents reference each other and tell a consistent story to the client.

Keeping method statements reusable

Most cleaning companies end up writing similar method statements repeatedly for similar job types — window cleaning, carpet cleaning, deep cleans. Building a small library of templates by task type, then adapting each one for site-specific details, saves significant time compared to starting from scratch for every new contract.

Frequently Asked Questions

Is a method statement a legal requirement for cleaning work?

Not always by law, but it's frequently a contractual requirement, especially for specialist cleaning, construction-related cleaning, or work in healthcare and education settings.

What's the difference between a method statement and a risk assessment?

A risk assessment identifies hazards and controls; a method statement describes the step-by-step process for carrying out the work safely. They're usually provided together as a RAMS document.

Ready to simplify your cleaning compliance?

Fovexa helps UK cleaning companies manage COSHH assessments, risk assessments, staff records and compliance documents in one simple platform.

Start Free